Proof that the design works for the people who will use it

Verification and validation show that your control room, HMI and alarm system meet the Human Factors requirements, and that operators can actually run the plant safely with them.

We plan and carry out the work, test the solution with your operators and document the results for your project and your authorities.

Two different questions

Verification and validation are not the same

Both are needed. A design can follow every guideline and still not work in practice, and a design operators like can still miss important requirements.

Verification

Did we build it right?

Verification checks the design against the HF requirements, standards and guidelines. It is done by HF specialists, often with checklists, drawings, mock-ups and design reviews.

  • Layout, consoles and sightlines
  • HMI and alarm design
  • Lighting, noise and work environment
Validation

Did we build the right thing?

Validation tests the integrated solution with real operators in realistic scenarios, to show that they can do their job safely and effectively.

  • Normal, abnormal and emergency scenarios
  • Workload and situation awareness
  • Teamwork and communication
The deliverables

Four documents, from design check to final sign-off

These are steps 7 to 10 of our HF engineering process, but we also carry them out on their own, for example to verify a design made by someone else.

07

HF Verification Report

During detailed design

Checks the design against the HF requirements and standards such as ISO 11064, and lists deviations and actions.

Typical contentChecklists, review findings, deviations and actions.
08

HF Validation Plan

Before testing

Describes how the solution will be tested with operators, and what counts as a pass.

Typical contentScenarios, participants, simulator or mock-up setup, measures and acceptance criteria.
09

HF Validation Report

After testing

Documents how operators performed and what needs to change before the system goes live.

Typical contentResults, workload and situation awareness, issues found and recommended changes.
10

Final HF Design Verification

Before handover

Confirms that the as-built solution matches the validated design and that all HF issues are closed.

Typical contentAs-built check, HF issue log status and final statement.
How we validate

Realistic tests, measurable results

Realistic scenarios

We build scenarios from the task analysis and the safety-critical tasks, so the tests cover the situations that matter most, not just normal operation.

Real operators

The people who will run the plant take part, in a simulator, a full-scale mock-up or the finished control room, depending on how far the project has come.

Clear criteria

We measure task performance, errors, workload and situation awareness against criteria agreed in advance, using established HF methods.

“The best time to find a design problem is before the operators have to live with it.”
HF Specialist