A Human Factors programme from plan to final verification
Large projects need more than good design ideas. They need a documented Human Factors process that shows how operator needs were identified, built into the design and proven to work.
We deliver it in four phases and ten steps, each with a clear deliverable. You can use the whole programme or pick the steps your project needs.
Human Factors as a thread through the whole project
When Human Factors only appears at the end of a project, problems are found when they are most expensive to fix. A structured HF programme starts before the design and follows it all the way to the finished control room.
Each step produces a document that the next step builds on. Together they give you, your authorities and your operators a clear record of how the design was reached and why it can be trusted.
- Operator needs are captured early, before costly decisions are made
- Design decisions can be traced back to tasks, functions and requirements
- Safety-critical tasks get the attention they need
- The solution is tested with real operators before it goes live
Ten steps, four phases
The steps follow the order of a typical project and the human-centred design process of ISO 11064 and ISO 9241-210. Several of them have their own service page with more detail.
Plan
Set the scope and the way of working before design starts.
HF Plan
Describes how Human Factors will be built into the project: scope, activities, methods, standards, responsibilities and schedule, and how end users will be involved.
Analyse
Understand the operation, the tasks and the people before anything is drawn.
Situation Analysis
Maps how the operation works today: existing control rooms, operating experience, incidents, and what operators think works well and what does not.
Functional Analysis and Function Allocation
Defines what the system must do and decides which functions are best handled by people, by automation, or by both together.
Task Analysis
Describes the operator tasks in detail, in normal operation, during disturbances and in emergencies.
Staffing and Qualification Analysis
Works out how many operators are needed per shift, what roles they have and what competence and training they need.
Analysis of Safety-Critical Tasks
Identifies the tasks where human error could have serious consequences and makes sure the design supports them.
Verify
Check the design against the requirements while it can still be changed.
HF Verification Report
Checks that the design, including layout, consoles, HMI, alarms and the work environment, meets the HF requirements and the relevant standards.
Validate and close
Prove the integrated solution works with real operators, and that what is built matches what was validated.
HF Validation Plan
Sets out how the integrated system will be tested with real operators: scenarios, participants, test setup and acceptance criteria.
HF Validation Report
Documents the results of the validation and what needs to change before the system goes live.
Final HF Design Verification
Confirms that the final, as-built solution matches the validated design and that all HF issues are closed.
A process that fits your project
End users involved throughout
Operators, shift leaders and maintenance staff take part in interviews, workshops, reviews and validation. They know the work best.
Issues tracked to closure
Every HF issue found along the way goes into an issue log, with an owner and an action, and is followed until it is closed in the final verification.
Scaled to the project
A small upgrade does not need the same documentation as a new central control room. We scale each step to the size and risk of your project.
“Human Factors is not a final check. It is a thread that runs through the whole project.”HF Specialist